75 Braintree Street

80 Units

16-month duration of construction

 

Studios, 1 BDRM, 2 BDRM, 3 BDRM, garage parking, bicycle storage.

Modern concept/open design/unit circulation.

Roof deck for tenant use.

LEEDS Certified – Silver, Striving for Gold certification.

One St. Clare Condominiums

18 Units

15-month duration of construction

 

8 Flats, 8 Tri-Levels

Tri-Levels have front and back side roof decks. The units have a modern concept, open design and unit circulation. 

Neighborhood integration

LEEDS/H.E.R.S. rating

31 Orleans Street

14 Units

13-month duration of construction

 

5 two bedroom + study units, 7 three bedroom units, and 2 studio units.

Neighborhood Integration, brick façade (to coincide with Webster Street homes), Mansard slate roof.

206 W. Broadway

16 Units of Rental Apartments

13-month duration of construction

7 One Bedroom Apartments, 9 Studios, 1 Commercial Storefront

Building a Better Boston Project

16 Income-Restricted studio and one-bedroom apartments

30 Polk Street

30 Units

14-month duration of construction

 

1 BDRM & 2 BDRM, garage parking, bicycle storage.

Modern concept/open design/unit circulation.

Oversized Roof deck including 4 private roof decks. 

FoMu Ice Cream

655 Tremont Street, South End

8-week duration of construction

 

General Contracting Project  

Completed the project in 8 weeks Opened just in time for Memorial Day

Project was completed early 

Project scope: kitchen, bath, custom counters & bakery showcase, custom table & bench seating 

Under Construction

11 Walley Street

38 Units

Anticipated duration: 16 months

 

Just under fifty-thousand gross square feet, this ground up construction building will feature a top-floor fitness center, common room, bicycle storage and roof deck, as well as 25 underground parking spaces. This budgeted $10M project is anticipated to receive occupancy in Summer 2020.

90 Ocean Avenue

75 Units of Rental Apartments

Anticipated duration: 19 months

 

Located parallel to Revere Beach Boulevard, this property is only 400 feet from the shore. Due to the project being below sea level, this brought challenges to the sight such as excavation/backfilling and dewatering. Due to extremely unstable soils Waypoint GC had to install Ground Improvements (100 GCC’s, 159 RAP’s) for the foundation stability. Construction cost: $16.5M